top of page
Reliability

(Case Studies)

Our company has earned a reputation for trustworthiness through a commitment to transparency, integrity, and consistent delivery of high-quality products/services. Our track record is supported by compelling case studies that showcase our reliability and dedication to client satisfaction.

These case studies provide concrete evidence of our ability to meet and exceed expectations, earning the trust of both clients and partners alike. Trust is not just a value we uphold; it's a cornerstone of our business, evident in every interaction and project we undertake.

IMG_8792.JPG

Worcestershire Royal Hospital

Case Studies

We retro fitted an old, steel Theatre Control Panel at Worcester Royal Hospital for a new Electronic Theatre Control Panel (ETCP). We removed the existing Theatre Control Panel, labelled all cables and interfaced them back into the new panel

which we installed in the same location.

We then fully tested the panel so that it was prepared for a successful commissioning.

Worcestershire_Royal_Hospital_small-c19-e1696187822223.jpg

Kingston Hospital

Case Studies

At Kingston Hospital we installed two 80kVA UPSs including all containment tray, cables, bypass panels and outgoing distribution boards.

We then went on to install 8 medical IT systems (IPS) including all tray, cables and containment, as well as 6 retractable pendants with their associated medical IT sockets and alarm systems.

We completed the project by testing all cables to BS7671 and HTM06-01 standards which included the installation of an Equipotential Bonding Bar (EBB) and earthing arrangements for the theatres to comply with Group 2 medical locations. The project was then successfully commissioned.

IMG_5628-1.jpg

Runnymede Hospital

Case Studies

At BMI The Runnymead Hospital we installed four Medical IT systems (IPS) at the beginning of the COVID-19 pandemic to assist with the shortage of high-dependency beds. This project was completed to BS7671:2018 and HTM06-01 standards ready for commissioning within a single week.

e4592b12c5b3d2cfb3987df3b2bdcbe2_auto_x2.jpg

Hereford HDU

Case Studies

At Hereford County Hospital we installed medical IT systems (IPS) and UPS systems to feed the clinical sockets for the new HDU unit at Hereford County Hospital. The project was installed in compliance with BS7671 and HTMO6-01 without any delays, on time and on budget, ready for commissioning engineers to test and handover.

326272675_873048974026052_673409708536502972_n_auto_x2.jpg

Supply,
Installation & 
Maintenance

As a hands-on and adaptable company, we can offer tailormade supply, installation & maintenance packages to suit our client’s needs.

Get in Touch

We operate with a strict non-disclosure policy and offer legally binding NDAs (Non-Disclosure Agreements) to all of our clients.

25 Balham Hill,

London, SW12 9DX

020 7859 4172

thumbnail_image006.png
thumbnail_image011_edited.jpg

Thanks for submitting!

bottom of page